Projects
Every job, documented the same way
Every SOAKD Roof & Concrete job is documented the same way: the condition we found, the pathway we chose and why, the system installed, hold-point photographs and a completion report. Job stories from our first projects will appear here in that format, named by suburb.
- Free inspection
- Every finding photographed
- Written scope, system named
The job story format
What each project record shows
We are a new division, so rather than borrow photographs from anyone else's work, this page shows exactly how ours will be recorded. Each project will follow these four parts, named by suburb, with the owner's permission.
-
01
The condition
What we found on inspection, photographed: the roof or slab as it was, and the defects that decided the pathway.
-
02
The pathway
Repair, restore, replace or build new, and why. The scope, the system by name and any variations.
-
03
The hold points
Dated photographs at each check: dryness, strip-off structure, pre-pour, cure and moisture readiness, masking.
-
04
The result
The finished work, the QA sign-off and the maintenance pathway, as handed to the owner in the completion report.
First job stories coming soon
Want to see how a job is scoped before then? Request a free inspection and we will walk you through the scope and report format for your roof or concrete.
Request a free inspectionEvidence, not assurances
Every major job closes with a completion report you keep.
Anyone can say the job was done properly. The completion report shows it: what was found, what was done, what went on and when, with the photographs to prove each stage.
How we document every projectCompletion report
Document- The condition we found, with photographs
- The pathway chosen and why
- The system installed, by name
- Hold-point records with dates
- Before, during and after photographs
- QA sign-off
- The maintenance pathway from here
Free inspection
Request a free inspection
Tell us what you are seeing. We inspect accessible areas, photograph what we find and explain the pathway the condition calls for before any price is discussed.
- 1
Tell us what you are seeing
Two minutes. Roof, concrete or both.
- 2
We inspect and photograph
Accessible areas, every finding photographed.
- 3
You get the pathway in writing
Repair, restore, replace or build new, with the system named.
Storm damage or water coming in now?
0468 029 068One number for inspections, quotes and make-safes.