Our method
The SOAKD Pathway: Diagnose, Decide, Deliver, Defend, Document
The SOAKD Pathway is the five-stage method behind every SOAKD Roof & Concrete job: Diagnose the condition, Decide the pathway, Deliver with the substrate fixed first, Defend the property and the finish, and Document the result. Recorded hold points sit between the stages so nothing moves on unchecked.
- Free inspection
- Every finding photographed
- Written scope, system named
-
01
Diagnose
Inspect accessible areas, photograph them and name the condition.
We look at the substrate before the finish: tiles, ridge and hip lines, bedding and pointing, flashings, valleys and penetrations on a roof; contamination, porosity, cracking, previous coatings and moisture on a slab. Every finding is photographed.
Recorded
- Photographed condition record
-
02
Decide
Repair, restore, replace or build new - the pathway the condition calls for.
The recommendation is written as a scope: inclusions, exclusions, assumptions, access, the actual system by name and the variation pathway. If restoration is the wrong call, the scope says so.
Recorded
- Written scope with the named system
-
03
Deliver
Fix the substrate first. Finish second.
Broken tiles, failed pointing, corroded fixings, cracked or contaminated concrete are dealt with before anything cosmetic. Work moves through recorded hold points and does not proceed past one until it is checked.
Recorded
- Dryness check before coating
- Structure check after strip-off
- Pre-pour check
- Cure and moisture readiness before coating
-
04
Defend
Protect everything around the work, and protect the finished surface.
Solar panels, fixtures, cars, gardens and the neighbours are masked and controlled. Weather and wind decide the go/no-go. If overspray cannot be controlled, we do not spray. The finish is protected with a compatible system.
Recorded
- Overspray check
- Weather and wind go/no-go
-
05
Document
Evidence, not assurances.
Before, during and after photographs, the hold-point record, a QA sign-off and a completion report with the maintenance pathway. You keep the record.
Recorded
- QA sign-off
- Completion report
Fix it first. Finish it second.
On a roof that means broken tiles, failed bedding and pointing, flashings and fixings before any primer or coating. On concrete it means cracks, contamination, old coatings and moisture before any sealer or overlay. A finish over a fault hides it.
The no-spray rule
Weather, wind and neighbouring exposures decide the go or no-go on every spray day. If overspray cannot be adequately controlled, we do not spray. We tell you why and reschedule in the same message.
Evidence, not assurances
Every major job closes with a completion report you keep.
Anyone can say the job was done properly. The completion report shows it: what was found, what was done, what went on and when, with the photographs to prove each stage.
How we document every projectCompletion report
Document- The condition we found, with photographs
- The pathway chosen and why
- The system installed, by name
- Hold-point records with dates
- Before, during and after photographs
- QA sign-off
- The maintenance pathway from here
FAQ
About the Pathway
Something not covered here? Call Daniel or request a free inspection and ask on site.
What is a hold point?
A hold point is a check that has to be passed and recorded before work moves to the next stage. Examples are confirming a roof is dry before primer goes on, checking the frame and battens after a roof is stripped, checking formwork and reinforcement before a pour, and confirming concrete is cured and dry enough before it is coated.
Why does the Pathway start with diagnosis instead of a price?
Because the price depends on the pathway, and the pathway depends on the condition. A quote for a coating on a roof that needs rebedding, or a sealer on a slab that is moving, is a quote for the wrong job. The diagnosis is photographed so you can see the reasoning.
What does Defend mean in practice?
Two things. Protecting everything around the work: solar panels, windows, cars, paving, gardens and the neighbours are masked and controlled, and weather and wind decide whether spraying happens. And protecting the finished surface with a primer, sealer or coating that is compatible with what it is going onto.
What do I receive at the end?
A completion report: the condition found, the pathway chosen and why, the system installed by name, the hold-point records, before, during and after photographs, the QA sign-off and the maintenance pathway from here.
Free inspection
Request a free inspection
Tell us what you are seeing. We inspect accessible areas, photograph what we find and explain the pathway the condition calls for before any price is discussed.
- 1
Tell us what you are seeing
Two minutes. Roof, concrete or both.
- 2
We inspect and photograph
Accessible areas, every finding photographed.
- 3
You get the pathway in writing
Repair, restore, replace or build new, with the system named.
Storm damage or water coming in now?
0468 029 068One number for inspections, quotes and make-safes.