School roof and concrete works planned around the school year

Schools should plan roof and concrete works from a photographed condition report, schedule disruptive work for the school holidays, and require a written scope that names the system and the hold points. We work to the school's contractor requirements, provide the documentation it asks for, including SWMS, and close each stage with a completion report.

  • Free inspection
  • Every finding photographed
  • Written scope, system named
Coated concrete driveway, side path and patio at a rendered coastal home

What schools are accountable for

A school answers for the safety of everyone on site, and for keeping learning going in the buildings it has. Roof and concrete work touches both. A leak over a classroom, a lifted path edge on the way to the canteen or a contractor working above a playground in class time all land on the principal or the business manager.

The failures are predictable. Work pushed into term because the holiday window was missed. A quote with no scope that cannot go to the board or through the approvals process. A recoat over failed pointing, the seal over the ridge caps, that leaks into the same classroom the next winter. Paperwork that arrives after the crew does.

Every job we do follows the SOAKD Pathway. Diagnose, decide, deliver, defend, document. For a school, that means planning starts well before the holidays.

Planning work for the school holidays

Disruptive work belongs in the school holidays. That includes roof work over occupied buildings, concrete pours on main paths and anything sprayed. Short, isolated repairs may suit a weekend or a closed-off area during term, if the school agrees.

The long summer break suits larger projects, such as a replacement or a full restoration. The shorter breaks suit smaller stages, repairs and concrete sections that can be closed, poured and cured inside the window. Cure is the period in which concrete gains strength and gives up its moisture.

The order that works is simple.

  1. Inspect during term. We inspect and photograph the roofs and concrete while the school is running, so access and constraints are seen as they really are.
  2. Scope and approval. The written scope goes through the school’s approval process in time for the holiday window.
  3. Allow for weather. Coating needs a dry surface and wind that allows overspray to be controlled. The program allows for weather, and the school hears first if a day moves.
  4. Hand back before term. Work areas are planned to be cleared, checked and documented before students return. If weather puts that at risk, we tell the school early and agree which areas stay closed.

Multi-building campuses

A campus is many smaller jobs on one site. Classroom blocks, halls, administration buildings, covered outdoor learning areas and demountables can each have a different roof, age and condition. We report building by building, so the school can see which roofs need repair now, which suit restoration and which are heading for replacement. Our guide on repairing, restoring or replacing a roof sets out the condition signs behind each call.

That report becomes the basis for a staged program. Each stage has its own scope, hold points and completion record. A hold point is a stage where work stops until a check is passed, such as confirming a roof is dry before it is primed.

Many school roofs also carry solar arrays. Panels are either masked in place or temporarily removed and reinstalled by a licensed electrician, depending on the system and the access needed, and the scope states who is responsible for each step.

Some older school buildings contain asbestos cement sheeting. We ask for the school’s asbestos register before work starts. We do not remove asbestos ourselves. It is assessed and managed through an appropriately licensed asbestos professional before roof work in that area continues.

Covered walkways, paths and play areas

Covered walkways carry students between buildings in the wet, and their roofs, gutters and flashings (the strips that seal joints and edges) are where many drips start. They are inspected and scoped like any other roof.

The concrete under and around them takes heavy foot traffic. We look for cracks with a lip, lifted edges at joints, ponding and worn surfaces. A sound path can be repaired and sealed through concrete restoration, with slip resistance planned where paths are often wet. A path that has sunk or lifted is replaced, with a recorded pre-pour check before any concrete arrives.

Site induction and your contractor requirements

Every school has its own contractor requirements. We work to the school’s contractor requirements and provide the documentation it asks for. Before work starts, that covers:

  • Site induction for the crew, on the school’s terms
  • SWMS, the safe work method statements for high-risk work such as work at heights
  • Working-at-heights controls set for each roof, including edges and fragile areas such as skylights
  • Exclusion zones, sign-in, access routes and how the work area is separated from students and staff
  • Licensed trades for electrical, solar, structural and asbestos work where the scope needs them

Send us the school’s contractor requirements at the scoping stage. That way the documentation is in place before work is scheduled, rather than chased in the first week of the holidays.

If overspray cannot be adequately controlled, we do not spray. On a school site that includes cars in the staff car park, play equipment and the neighbouring homes.

Storm damage on a school roof

If a storm damages a school roof, safety comes first. Keep people out of affected rooms and away from water near electrical fittings. Where the roof can be accessed safely, we carry out a make-safe, the temporary work that reduces hazards and limits water getting in, and write a report with photographs, the temporary work done and the recommended permanent repair. It is written for the school and its insurer or asset team. Our page on emergency roof repairs explains how a storm call runs.

What to ask any contractor working at your school

Use these questions to compare contractors before the holiday window is booked.

  1. Can we see the condition of each roof and path, photographed and labelled by building?
  2. Is each item repair, restoration or replacement, and why?
  3. Can the work fit the holiday window, and what happens if weather delays it?
  4. Which system will be used, by name?
  5. What are the hold points, and how is each one recorded?
  6. How will the work area be separated from students, staff and visitors?
  7. Can you meet our contractor requirements, including any checks we require for people working on a school site, and show the evidence?
  8. How are asbestos and concealed conditions handled?
  9. What do we receive at completion for our maintenance records?

Request a school inspection

We can inspect during term so holiday works are scoped in time. We work across the Central Coast, Lake Macquarie, Newcastle and Sydney. The inspection is free. Request an inspection or call 0468 029 068.

How every job runs

The SOAKD Pathway. Five stages, every job.

Every roof and every slab goes through the same five stages, with recorded hold points between them. Nothing moves past a hold point until it has been checked.

  1. 01

    Diagnose

    Inspect accessible areas, photograph them and name the condition.

  2. 02

    Decide

    Repair, restore, replace or build new - the pathway the condition calls for.

  3. 03

    Deliver

    Fix the substrate first. Finish second.

  4. 04

    Defend

    Protect everything around the work, and protect the finished surface.

  5. 05

    Document

    Evidence, not assurances.

See the hold points at each stage

Evidence, not assurances

Every major job closes with a completion report you keep.

Anyone can say the job was done properly. The completion report shows it: what was found, what was done, what went on and when, with the photographs to prove each stage.

How we document every project

Completion report

Document
  • The condition we found, with photographs
  • The pathway chosen and why
  • The system installed, by name
  • Hold-point records with dates
  • Before, during and after photographs
  • QA sign-off
  • The maintenance pathway from here

FAQ

Schools & Education: your questions

Something not covered here? Call Daniel or request a free inspection and ask on site.

When should a school schedule roof and concrete works?

Disruptive work, such as roof work over occupied buildings, concrete pours on main paths and anything sprayed, belongs in the school holidays. The long summer break suits larger projects, and the shorter breaks suit smaller stages. Inspect and scope during term, so the work can go through the school's approval process before the holiday window, with time allowed for weather on coating days.

Can roof work be done while students are on site?

Some small, isolated repairs can be, if the school agrees, the area under and around the work is closed off, and access routes keep students and staff clear. Larger roof work, spraying and concrete pours on main paths are planned for the school holidays. The scope states which work happens when and how the work area is separated from the school.

What documentation do you provide to a school?

We work to the school's contractor requirements and provide the documentation it asks for. That includes the written scope with the named system, SWMS for high-risk work such as work at heights, site induction records, the hold-point records and a completion report with before, during and after photographs. Send us your contractor requirements early so everything is in place before work is scheduled.

Can you work across a whole campus in stages?

Yes. We report on each building, covered walkway and path, then group the work into stages that suit the school's priorities and holiday windows. Each stage has its own scope, hold points and completion record, so the school can approve and fund one stage at a time and keep a building-by-building record of what was done.

What happens if asbestos is found on a school roof?

Work in that area stops. We do not remove asbestos ourselves. It is assessed and managed through an appropriately licensed asbestos professional before roof work in that area continues. Where the school's asbestos register already identifies it, the scope states how it will be handled and by whom. Where it is found later, the school receives a written variation before anything proceeds.

Do you repair covered walkways and school paths?

Yes. Covered walkway roofs, gutters and flashings are inspected and repaired like any other roof. The paths beneath them are checked for cracks, lifted edges, ponding and worn surfaces. Sound concrete can be repaired and sealed, with slip resistance planned where paths are often wet. Paths that have sunk or lifted are replaced, with a recorded check before any concrete is poured.

Free inspection

Request a free inspection

Tell us what you are seeing. We inspect accessible areas, photograph what we find and explain the pathway the condition calls for before any price is discussed.

  1. 1

    Tell us what you are seeing

    Two minutes. Roof, concrete or both.

  2. 2

    We inspect and photograph

    Accessible areas, every finding photographed.

  3. 3

    You get the pathway in writing

    Repair, restore, replace or build new, with the system named.

Storm damage or water coming in now?

0468 029 068

One number for inspections, quotes and make-safes.

Free inspection

What would you like us to look at?

What would you like us to look at? (required)

Prefer to talk? 0468 029 068

Free inspection